USED AND NEW CEMENT PLANTS

BACK

  OFFER 3000 MT/DAY CEMENT PLANT BRAND NEW TURNKEY

Brand new Cement Plant 3000 MT/day turnkey installed
consisting of Machinery equipments,
Limestone crushing & conveying
Clay crushing & conveying
Clay & iron powder pre-homogenization pile
Limestone pre-homogenization pile
Raw material dosing station
Raw material grinding & exhaust gas treatment
Raw meal homogenization silo & feeding kiln
Clinker cooler( kiln rear burning)
Rotary kiln & triple air duct
Kiln head & clinker conveying
Natural gas system burns
Clinker, gypsum storage & dosing & conveying
Gypsum crushing & conveying
. Cement grinding & conveying
Cement storage & bulk loading
Cement packing & conveying
Chemical laboratory equipment
Electrical, automation, communication & motive equipments
DCS DCS central control
Substation for limestone crushing
Electric room for cement packing
Electric room for raw meal mill
Electric room for kiln rear
Electric room for kiln head
Electric room for cement grinding
Total flat surface for electric
Compressed air station and piping net
Oil pump house
Ventilation and air conditioner for whole factory
Water supply and drainage equipments
Design Installation packing and transportation to port (FOB)
one year spare parts first lubricant
Full technical service
Guidance fee of technical experts for test run - Training
64,5 Million USD (price FOB Shanghai)
Excluding shipping cost and the civil works at destination
Details and pictures on request - manufacturer profil with name of intalled plants after LOI and BCL.
LETTER FROM THE OWNER
Dear Sir,
Thanks for your reply about building a new cement plant of 3000t/d. Now I will give you an
explanation about this project.
We guarantee we will make a new brand cement plant with the newest technology and
process. This system is composed of 5 stage pre-heating system, the rotary kiln will be used,
the raw mill grinding will be used vertical mill. The cement mill will be used ball mill. in this
offer, the kiln is operated by gas burning, if you use oil, we will standby another set
equipment. The storage is covered. The electrical parts we take Siemens brand.
Time scale
The equipment manufacture need 9 months, erection need 10 months, design need 4-6
months, but the design and equipment manufacture will be done at the same time. So this
project will take with total time almost 24 months from beginning of the civil works to the last
cement production.
1.The scope of supply of my company for this turnkey contract includes all the equipment and
materials necessary to achieve successful operation of the new facility within the specified
performance guarantees. More precisely the scope of supply of my company includes:
a. Mechanical equipment
b. Electrical equipment
c. Main electric station at the plant
(Excl. main substation for national grid changed to 10kV)
d. Electric substations and cables
e. Lighting for production workshop and the road of in the plant.
f. Automation equipment
g. Fire insulation and refractory materials
h. Mechanical and electrical spare parts for 1 year
i. Supply & drain water equipments and pipes
j. First lubricant
k. Laboratory equipment
l. List of mechanical workshop equipment
m. Truck weigh bridge
2) Services
The following services are part of the scope of the Party B:
a. Mechanical and electrical design
b. Civil and Structural design(Chinese standard)
c. Instrumentation and automation design
d. Piping and cabling design
e. Supervision of civil and structural works
f. Erection of equipment
g. Commissioning and start-up
h. Supervision of performance tests
i. Training of client's personnel
2. Scope of client
The following items are excluded from the scope of my company.
Quarry equipment
b. Water source and supply to tapping point
c. 80~100 t crane or two 50 t cranes
d. 150T/m crane for erection of the pre-heater tower;
e. Workers accommodation, office, kitchen etc. facilities,
f. Water, electricity, oxygen and ethane for welding
g. 500 kW Electric generator
h. Transportation from the Chinese port to the contract site
i. Dozers, loaders, trucks & vehicles.
j. main substation for national grid changed to 10kV
k. Air tickets for client's trainees to China.
.
Sope of my company and client: Civil & structural construction works
Client is responsible for all finance related matters; my company is responsible of technical
related matter.
All steel structures in civil works are borne by client.
The civil works will be done by the client, including the concrete works and steel
structure.
The final price including all the above items
At last, we invite you to visit our company and discuss it in detail in the meeting.
The quotation for 3000t/d Cement Production Line Project includes
Machinery equipments
1.
Limestone crushing & conveying
2.
Clay crushing & conveying
3.
Clay & iron powder pre-homogenization pile
4.
Limestone pre-homogenization pile
5.
Raw material dosing station
6.
Raw material grinding & exhaust gas treatment
7.
Raw meal homogenization silo & feeding kiln
8.
Clinker cooler( kiln rear burning)
9
Rotary kiln & triple air duct
10.
Kiln head & clinker conveying 11.
Natural gas system burns
12.
Clinker, gypsum storage & dosing & conveying
13. Gypsum crushing & conveying
14. Cement grinding & conveying
15. Cement storage & bulk loading
16. Cement packing & conveying
17. Chemical laboratory equipment
18.
.
Electrical, automation, communication & motive
e1q.DuCipSments DCS central control
2. Substation for limestone crushing
3. Electric room for cement packing
4. Electric room for raw meal mill
5. Electric room for kiln rear
6. Electric room for kiln head
7. Electric room for cement grinding
8. Total flat surface for electric
9. Compressed air station and piping net
10. Oil pump house
Name of item
11.
Ventilation and air conditioner for whole factory
12. Electric wire , cable & etc.
. Building material of stove
Heat insulting material
. Water supply and drainage
. Non-standard materials
. Design fee
. Installation fee
.(FOB) packing and transportation
. one year spare parts
XI. first lubricant
XII. Fee of technical service (Cost during
installation and debugging)
XIII.
Guidance fee of technical experts for test
XIV training
 
 


Wir haben das hier gerade bekommen:

BRIEF OFFER 3000 MT/DAY CEMENT PLANT BRAND NEW TURNKEY
Brand new Cement Plant 3000 MT/day turnkey installed
consisting of Machinery equipments,
Limestone crushing & conveying
Clay crushing & conveying
Clay & iron powder pre-homogenization pile
Limestone pre-homogenization pile
Raw material dosing station
Raw material grinding & exhaust gas treatment
Raw meal homogenization silo & feeding kiln
Clinker cooler( kiln rear burning)
Rotary kiln & triple air duct
Kiln head & clinker conveying
Natural gas system burns
Clinker, gypsum storage & dosing & conveying
Gypsum crushing & conveying
. Cement grinding & conveying
Cement storage & bulk loading
Cement packing & conveying
Chemical laboratory equipment
Electrical, automation, communication & motive equipments
DCS DCS central control
Substation for limestone crushing
Electric room for cement packing
Electric room for raw meal mill
Electric room for kiln rear
Electric room for kiln head
Electric room for cement grinding
Total flat surface for electric
Compressed air station and piping net
Oil pump house
Ventilation and air conditioner for whole factory
Water supply and drainage equipments
Design Installation packing and transportation to port (FOB)
one year spare parts first lubricant
Full technical service
Guidance fee of technical experts for test run - Training
64,5 Million USD (price FOB Shanghai)
Excluding shipping cost and the civil works at destination
Details and pictures on request - manufacturer profil with name of intalled plants after LOI and BCL.
LETTER FROM THE OWNER
Dear Sir,
Thanks for your reply about building a new cement plant of 3000t/d. Now I will give you an
explanation about this project.
We guarantee we will make a new brand cement plant with the newest technology and
process. This system is composed of 5 stage pre-heating system, the rotary kiln will be used,
the raw mill grinding will be used vertical mill. The cement mill will be used ball mill. in this
offer, the kiln is operated by gas burning, if you use oil, we will standby another set
equipment. The storage is covered. The electrical parts we take Siemens brand.
Time scale
The equipment manufacture need 9 months, erection need 10 months, design need 4-6
months, but the design and equipment manufacture will be done at the same time. So this
project will take with total time almost 24 months from beginning of the civil works to the last
cement production.
1.The scope of supply of my company for this turnkey contract includes all the equipment and
materials necessary to achieve successful operation of the new facility within the specified
performance guarantees. More precisely the scope of supply of my company includes:
a. Mechanical equipment
b. Electrical equipment
c. Main electric station at the plant
(Excl. main substation for national grid changed to 10kV)
d. Electric substations and cables
e. Lighting for production workshop and the road of in the plant.
f. Automation equipment
g. Fire insulation and refractory materials
h. Mechanical and electrical spare parts for 1 year
i. Supply & drain water equipments and pipes
j. First lubricant
k. Laboratory equipment
l. List of mechanical workshop equipment
m. Truck weigh bridge
2) Services
The following services are part of the scope of the Party B:
a. Mechanical and electrical design
b. Civil and Structural design(Chinese standard)
c. Instrumentation and automation design
d. Piping and cabling design
e. Supervision of civil and structural works
f. Erection of equipment
g. Commissioning and start-up
h. Supervision of performance tests
i. Training of client's personnel
2. Scope of client
The following items are excluded from the scope of my company.
Quarry equipment
b. Water source and supply to tapping point
c. 80~100 t crane or two 50 t cranes
d. 150T/m crane for erection of the pre-heater tower;
e. Workers accommodation, office, kitchen etc. facilities,
f. Water, electricity, oxygen and ethane for welding
g. 500 kW Electric generator
h. Transportation from the Chinese port to the contract site
i. Dozers, loaders, trucks & vehicles.
j. main substation for national grid changed to 10kV
k. Air tickets for client's trainees to China.
.
Sope of my company and client: Civil & structural construction works
Client is responsible for all finance related matters; my company is responsible of technical
related matter.
All steel structures in civil works are borne by client.
The civil works will be done by the client, including the concrete works and steel
structure.
The final price including all the above items
At last, we invite you to visit our company and discuss it in detail in the meeting.
The quotation for 3000t/d Cement Production Line Project includes
Machinery equipments
1.
Limestone crushing & conveying
2.
Clay crushing & conveying
3.
Clay & iron powder pre-homogenization pile
4.
Limestone pre-homogenization pile
5.
Raw material dosing station
6.
Raw material grinding & exhaust gas treatment
7.
Raw meal homogenization silo & feeding kiln
8.
Clinker cooler( kiln rear burning)
9
Rotary kiln & triple air duct
10.
Kiln head & clinker conveying 11.
Natural gas system burns
12.
Clinker, gypsum storage & dosing & conveying
13. Gypsum crushing & conveying
14. Cement grinding & conveying
15. Cement storage & bulk loading
16. Cement packing & conveying
17. Chemical laboratory equipment
18.
.
Electrical, automation, communication & motive
e1q.DuCipSments DCS central control
2. Substation for limestone crushing
3. Electric room for cement packing
4. Electric room for raw meal mill
5. Electric room for kiln rear
6. Electric room for kiln head
7. Electric room for cement grinding
8. Total flat surface for electric
9. Compressed air station and piping net
10. Oil pump house
Name of item
11.
Ventilation and air conditioner for whole factory
12. Electric wire , cable & etc.
. Building material of stove
Heat insulting material
. Water supply and drainage
. Non-standard materials
. Design fee
. Installation fee
.(FOB) packing and transportation
. one year spare parts
XI. first lubricant
XII. Fee of technical service (Cost during
installation and debugging)
XIII.
Guidance fee of technical experts for test
XIV training
 

 



 

 

 

 USED CEMENT PLANT 1.500 MT/DAY

 

We have one offer as below for a 1,500MT/day Cement Plant on Turnkey Project .

Price is Euro 33.55 Million, this price includes dismantling, total overhaul, turnkey installation, consulting, training plus

Guarantee: 12 month after production start. The plant can be dismantled easily and just one packing unit is needed
This price includes product support, supervising and training of staff. After production start the plant will be support by our staff further 3 month


Not included: infrastructure (roads, buildings, foundations, electricity and water supply)


40,000 square meters land is needed for the complete production plant for cement consisting of 2 lines each 750 MT/days - in total 1500 MT/day
Includes automatic Balance system 1200 bags / hour

Automatic palletize system - Automatic roller-system
Year of construction 1981 / modernization 1991-2 until today 2008
Many new parts: New EDP control, New breaker
New burners (buyer can decide whether he wants oil, gas or coal) etc.
Plant is still in operation ( 1 line active)

Dismantling and construction on destination from one hand (complete-price).
It will take only 18 month until the plant will be in operation at buyer`s place

 A Memorandum Of Understanding and  a Fee Protection Agreement will be signed between buyer and the mandate company.

USD 125.000 deposit in our bank before any inspection and table talk meeting.

If buyer party cancel the project, USD 25,000 will be our cost negotiating this project. USD 100,000 will be refunded from our bank.

 

For all other information we need ICPO and BCL to proceed ( Attached ).
Please contact us for further information if you are interested.