Waste Tyre recycling plants and machines

back  e-mail

 


Representation:

 

 

150KG/HOUR TIRE GRANULATING LINE  NEW

(USE WASTE TIRES TO MAKE 0-1MM,1-3MM,3-5MM RUBBER GRANULES AND SEPARATE OUT STEEL AND FIBER)

Machinery Price List is as below table:

No. Equipment name

  No Equipment name quantity Unit Rated Power Total Power Unit Price FOB Cingdao Total Price FOB
  1 JYQQ-1200 TIRE SIDEWALL CUTTER 1 Set 5.5 Kw/Set  5.50 Kw US$1,800.00 US$1,800.00
  2 JYQT-38 TIRE STRIP CUTTER 1 Set 5.5 Kw/Set  5.50 Kw US$3,300.00 US$3,300.00
  3 JYQK-45 TIRE BLOCK CUTTER 1 Set 11 Kw/Set 11.00 Kw US$2,200.00 US$2,200.00
  4 JYNQ-1200 TIRE BEAD SEPARATOR 1 Set 15 Kw/Set 15.00 Kw US$5,100.00 US$5,100.00
  5  BELT CONVEYOR 1 Set 0.55 Kw/Set 0.55 Kw US$2,000.00 US$2,000.00
  6 JYLS-500 TIRE (RUBBER) BLOCK GRANULATOR 1 Set 22 Kw/Set 22.00 Kw US$8,500.00 US$8,500.00
  7 JYC-100 WHIRLWIND COLLECTING MACHINE 1 Set 3 Kw/Set  3.00 Kw US$2,400.00 US$2,400.00
  8 JYCX-200 STEEL WIRE SEPARATOR 2 Set 2.2 Kw/Set 4.40 Kw US$3,700.00 US$7,400.00
  9  JYXF-150 FIBER SEPARATOR 4 Set 1.5 Kw/Set 6.00 Kw US$2,800.00 US$11,200.00
  10 JYYZS-800 ROUND VIBRATION SCREEN 1 Set 1 Set 0.75 Kw 0.75 Kw US$2,400.00 US$2,400.00
          73,70 kW  

 

US$46,300.00

US$46,300.00

 

300KG/HOUR TIRE GRANULATING LINE NEW

(USE WASTE TIRES TO MAKE 0-1MM,1-3MM,3-5MM RUBBER GRANULES AND SEPARATE OUT STEEL AND FIBER)

 

No. Equipment name

  No Equipment name quantity Unit Rated Power Total Power Unit Price FOB Cingdao Total Price FOB
  1 JYQQ-1200 TIRE SIDEWALL CUTTER 1 Set 5.5 Kw/Set  5.50 Kw US$1,800.00 US$1,800.00
  2 JYQT-38 TIRE STRIP CUTTER 1 Set 5.5 Kw/Set  5.50 Kw US$3,300.00 US$3,300.00
  3 JYQK-45 TIRE BLOCK CUTTER 1 Set 11 Kw/Set 11.00 Kw US$2,200.00 US$2,200.00
  4 JYNQ-1200 TIRE BEAD SEPARATOR 1 Set 15 Kw/Set 15.00 Kw US$5,100.00 US$5,100.00
  5  BELT CONVEYOR 3 Set 0.55 Kw/Set 0.55 Kw US$2,000.00 US$6,000.00
  6 JYLS-500 TIRE (RUBBER) BLOCK GRANULATOR 2 Set 22 Kw/Set 22.00 Kw US$8,500.00 US$17,000.00
  7 JYC-100 WHIRLWIND COLLECTING MACHINE 1 Set 3 Kw/Set  3.00 Kw US$2,400.00 US$2,400.00
  8 JYCX-200 STEEL WIRE SEPARATOR 2 Set 2.2 Kw/Set 4.40 Kw US$3,700.00 US$7,400.00
  9  JYXF-150 FIBER SEPARATOR 4 Set 1.5 Kw/Set 6.00 Kw US$2,800.00 US$11,200.00
  10 JYYZS-800 ROUND VIBRATION SCREEN 1 Set 1 Set 0.75 Kw 0.75 Kw US$2,400.00 US$2,400.00
          96,80 kW  

 

US$58,800.00

US$58,800.00

 

DIFFERENT CAPACITY OF TIRE RECYCLING LINE

Hereunder are the 6 most popular tire recycling line offered by us, you can browse the details of each by clicking on it. 

1). 50-100KG/HOUR TIRE RECYCLING LINE. 30-35Kw/hour.

2). 100-150KG/HOUR TIRE RECYCLING LINE.  35-40Kw/hour

3). 200-300KG/HOUR TIRE RECYCLING LINE.  60-65Kw/hour.

4). 300-400KG/HOUR TIRE RECYCLING LINE.  70-75Kw/hour

5). 500-600KG/HOUR TIRE RECYCLING LINE.  100-105Kw/hour  

6). 1000-1200KG/HOUR TIRE RECYCLING LINE.   200-210Kw/hour

7). 1500-1800KG/HOUR TIRE RECYCLING LINE. 300-315Kw/hour

8). 2000-2400KG/HOUR TIRE RECYCLING LINE.  400-420Kw/hour

They are only for reference to you, we will design relative tire recycling line for you according to your output size and capacity requirement.

 

A continuación son de la línea 6 de reciclaje de neumáticos más populares ofrecidos por nosotros, puede navegar por los detalles de cada uno haciendo clic en él. 

. 1) LLANTAS DE RECICLAJE 50-100KG/HOUR LINE.   30-35Kw/hour.

. 2) una TIRE 00-150KG/HOUR RECICLAJE DE LÍNEA.   35-40Kw/hour

. 3) LLANTAS 200-300KG/HOUR RECICLAJE DE LÍNEA .   - , 60-65Kw/hour.

. 4) LLANTAS DE RECICLAJE 300-400KG/HOUR LINE.    70-75Kw/hour

. 5) LLANTAS DE RECICLAJE 500-600KG/HOUR LINE.    100-105Kw/hour  

. 6) 1000-1200KG/HOUR TIRE línea de reciclaje.    200-210Kw/hour

. 7) 1500-1800KG/HOUR TIRE línea de reciclaje.     300-315Kw/hour

. 8) 2000-2400KG/HOUR TIRE línea de reciclaje.     400-420Kw/hour

Ellos son sólo una referencia para usted, vamos a diseñar la línea de reciclaje de neumáticos en relación a que de acuerdo a su tamaño de salida y el requisito de capacidad.

 

 

1.If you have any question, please feel free to send us your questions

2.Inspection:When the machines are finished, we will invite you to come to China to inspect your machines.

3.Time of Shipment: Need to confirm according to our production queue,normally within 20-40days after receiving your deposit.

4. After Sale Services:We will offer spare parts at cost prices, and offer all-life technical support, if the you require, we also can send one or two of our techncians to help you install the machine and train the operators for no more 4 weeks time, all relative cost, include round-trip air ticket, hotel cost, food, and salary (US$50/Man.Day) should be on your cost.

5. Warranty:We can offer 12 Months warranty after the machines reaching your seaport

6. Payment terms:30% deposit by T/T, another 70% before shipment by T/T or by Irrevocable Confirmed L/C at sight.

7.Power System:We Machine can customize the machine power system according to your local power supply data.

8.Power Consumption:The Rated Power is not the real power consumption. Because NO.(1), (2), (3),(4) not always work. The real power consumption will be about 25-35Kw/hour.

9.Please Note below points:

1). All our machines has CE certificate, are widely sold globally, inlcude European Union and USA.